Skip to content

Replace old MPSC/SPSC queues with JCTools #1516

Replace old MPSC/SPSC queues with JCTools

Replace old MPSC/SPSC queues with JCTools #1516

Triggered via pull request October 25, 2023 12:51
Status Cancelled
Total duration 4m 33s
Artifacts

build-pull.yml

on: pull_request
Check conventional commits
15s
Check conventional commits
Compatibility Check
2m 57s
Compatibility Check
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Build with Java 17
Canceling since a higher priority waiting request for 'check-pull-request-Check pull requests-refs/pull/1413/merge' exists
Build with Java 17
Task java.util.concurrent.ScheduledThreadPoolExecutor$ScheduledFutureTask@7db32a82[Cancelled] rejected from java.util.concurrent.ThreadPoolExecutor@2cd56191[Terminated, pool size = 3, active threads = 0, queued tasks = 0, completed tasks = 5131]
Build with Java 17
The operation was canceled.
Build with Java 21
Canceling since a higher priority waiting request for 'check-pull-request-Check pull requests-refs/pull/1413/merge' exists
Build with Java 21
Task java.util.concurrent.ScheduledThreadPoolExecutor$ScheduledFutureTask@c8cab0a[Not completed, task = java.util.concurrent.Executors$RunnableAdapter@70000901[Wrapped task = io.smallrye.mutiny.operators.multi.builders.IntervalMulti$IntervalRunnable@6d3de904]] rejected from java.util.concurrent.ThreadPoolExecutor@183fc2fa[Terminated, pool size = 0, active threads = 0, queued tasks = 0, completed tasks = 48884]
Build with Java 21
The operation was canceled.
Build with Java 11
Canceling since a higher priority waiting request for 'check-pull-request-Check pull requests-refs/pull/1413/merge' exists
Build with Java 11
The operation was canceled.